Timelines vary by facility size, complexity, and accrediting authority, but most SCIF projects run several months from design through accreditation — and the biggest delays come from problems that could have been caught on paper. Engaging an advisor during design and pre-construction, rather than after construction is underway, is the single most effective way to protect your schedule and avoid costly rework.